Fulton Duel Fuel Boilers at Stuart Lake,
This project highlights the reliability of the Fulton dual-fuel boilers, the importance of collaboration across teams, and the successful operation of the system through its first year of service.
Pitt Meadows Group
Stuart Lake
3 VTG-4000DF
“At the design stage we wanted to incorporate a dual-fuel boiler that is represented in BC so that the health authority would have good product support should they need it. Given the remote site, the boiler needed to be reliable too considering it could take some time between when a boiler requires service and when a technician would be able to visit site. We have worked with Raven Supply previously and learned that your company is great to work with during the product selection process and that the company sells reputable products.
Early October represents one year since the project reached substantial completion so the boilers have operated through all four seasons now. We are not aware of any issues with boiler startup or operation over the past year. We will certainly reach out again to Raven Supply for our next boiler selection.”
“The project was on schedule and the Fulton and Raven team was always available for design coordination and logistics throughout. After sales services such as commissioning, troubleshooting and warranty were excellent. This reflects the professionalism and dedication of the Fulton and Raven team, and we extend our sincere appreciation for their efforts.”
Contact our team for more information!