Electric Boiler for Net Zero Carbon Emission
Supporting Puratos on their path to Net Zero
Raven Supply is proud to have partnered with Puratos to support their Net Zero emissions goals at their Fraser Valley facility.
Puratos
Fraser Valley facility
720 kW electric boilers
Puratos wanted to transition away from gas-fired boilers and explored electric boiler solutions to achieve zero-emission heating. Initially, a 1,440 kW unit was considered, but this would have required the facility to hire a Class 3 Power Engineer under BC regulations, adding extra cost and complexity.
Our team at Raven worked closely with Puratos and ACME Engineering Boilers to recommend a more efficient solution:
This project is a perfect example of how collaboration, smart design choices, and the right technology can align operational efficiency with environmental responsibility.
A big thank you to Puratos for their commitment to a better tomorrow, and to ACME Boilers for supplying the technology that made this possible.
Here’s to building a cleaner, more sustainable future, one project at a time.
Contact our team for more information!